IESCO Power Suspension Schedule – Areas & Timings for Jan 26, 2026

IESCO Power Suspension Schedule
The IESCO Power Suspension Schedule for Monday, January 26, 2026 has been officially announced by the Islamabad Electric Supply Company (IESCO). Electricity will be temporarily suspended in Islamabad, Rawalpindi, Attock, Chakwal, Jhelum, and Azad Kashmir due to essential maintenance and system upgrades. This planned power outage is part of IESCO’s long‑term strategy to improve stability, safety, and reliability of the electricity network for consumers. Information comes from the official IESCO notification
Below is the detailed IESCO Power Suspension Schedule to help consumers plan their day effectively.
| Date | Timings |
|---|---|
| Jan 26, 2026 | 07:00 AM – 06:00 PM |
| Jan 26, 2026 | 09:00 AM – 02:00 PM |
| Jan 26, 2026 | 10:00 AM – 04:00 PM |
| Jan 26, 2026 | 12:00 PM – 04:00 PM |
| — | — |
| Note | Timings vary by feeder/area |
| — | — |
| Source | Official IESCO announcement |
Why IESCO Announces the Power Suspension Schedule
The IESCO Power Suspension Schedule is shared publicly to prepare residents before planned outages. The main reasons include:
- Preventive maintenance of feeders
- Load management and system upgrades
- Safety inspections & fault prevention
- Development work on transmission lines
These scheduled shutdowns are often inconvenient in the moment, but they help reduce unexpected breakdowns and long outages later.
Also Read ; 8123 Rashan Code Update 2025–2026
Islamabad Circle – Power Outage Details
The power suspension for Islamabad Circle on January 26 is scheduled as follows:
Areas Affected (09:00 AM – 02:00 PM)
- TDCP
- MCM
- Gharial
- Upper Topa
- Patriata
- PAF
- Kuldana
Residents in these areas are advised to prepare backup power solutions like UPS or generators in advance to avoid disruptions in daily routines.
Rawalpindi & Nearby Areas – Suspension Breakdown
Planned Outages by Timing
The outage in parts of Rawalpindi and neighbourhoods will vary by feeder and requirements. Typical outages in these regions may include:
- Committee Chowk Feeder
- Zafar ul Haq Feeder
- Arya Mohallah Feeder
These are scheduled depending on system work and may be restored earlier if completed ahead of time. (This kind of scheduling is part of routine maintenance planning where timings vary by section.)

Timing & What It Means for You
Here’s how the latest IESCO Power Suspension Schedule affects your power:
- 07:00 – 06:00 Long outages usually for major infrastructure maintenance across multiple feeders.
- 09:00 – 02:00 Medium outages typically for standard maintenance work.
- 10:00 – 04:00 / 12:00 – 04:00 Shorter schedules covering targeted feeder work under specific operational plans.
Always check your local notices or IESCO’s official sources for updates or changes.
1. How to Stay Informed (Quick Guide)
- Follow IESCO official website and social channels for the latest updates.
- Check local notices in your area daily.
- Have backup power ready (UPS, generator, or battery packs) before scheduled times.
Preparing in advance can make these planned outages more manageable and less disruptive to your daily life.
Official Helpline & Contacts
If you need help or want more details about your area’s power schedule, use the IESCO contacts below. These are based on official information
Primary Helpline
- Toll‑Free Helpline: 118 – For emergencies, outages, and quick support.
- SMS Service: 8118 – Report issues using SMS service for complaints or bill info.
Head Office
- IESCO Head Office, Street #40, Sector G‑7/4, Islamabad
- Phone: +92‑51‑9252937
Regional Contact Numbers
- Rawalpindi Region: 051‑9291261
- Attock Region: 057‑2521133
- Jhelum Region: 054‑4001400
- Chakwal Region: 054‑2210060
These contacts can assist with complaints, bill inquiries, or schedule details.
Tips to Manage Schedule Interruptions
- Charge devices the night before.
- Avoid major electrical work during outage times.
- Plan study or work around the power window.
- Use power banks for small appliances.
Planning helps maintain productivity and comfort during scheduled outages.
Conclusion
The IESCO Power Suspension Schedule for January 26, 2026 means electricity will be temporarily switched off in various areas for maintenance work. Knowing the schedules and timeframes helps you plan your day better and avoid surprises. Always refer to the official IESCO website and reliable sources for the most accurate updates and contact helpline numbers for any support you need.
FAQs
What is the IESCO Power Suspension Schedule?
The IESCO Power Suspension Schedule is a planned list of areas and times when electricity service will be temporarily off due to maintenance and upgrades.
Where can I find the official outage schedule?
You can visit the official IESCO website or trusted news sources to see announcements and updates on power suspension schedules.
How do I report an outage or problem?
Call 118 or send an SMS to 8118 to report issues or ask for updates on power outages.
Can power be restored earlier than scheduled?
Yes, if maintenance work finishes early, electricity may be restored before the scheduled time in your area.
Related Posts














